Education
Drilling in the courtyard at New HEALTH
On Saturday, December 16, a hole will be drilled in the concrete deck in the courtyard between building 28a and New HEALTH – the courtyard opposite the two auditoriums U300 and U301.
New ventilation channels need to be installed for the biobank, which means there will be a lot of noise. Therefore, consider finding another place to study or work on that day.